Plan property work with fewer surprises
Existing systems reviewed
We inspect relevant services before confirming installation work.
Schedules discussed early
Project dates and access help us plan the right visit sequence.
Compliance visits organised
We arrange annual gas checks around property access details.

From annual checks to larger installations
We travel to Washington for domestic plumbing, heating and gas work, including boiler replacement, landlord gas safety checks and kitchen plumbing. The jobs differ in size, but each starts with accurate property information. Boiler projects need details of the existing system and household demand. CP12 visits require appliance and access arrangements, while kitchen work depends on the proposed layout, cabinets and appliance positions. We use these details to plan an on-site assessment or suitable appointment.
Assess the existing services before changing them
Larger planned projects in Washington begin with an inspection of accessible pipework, controls, wastes and other relevant services. We compare the existing setup with the proposed work, then explain what alterations are likely to be needed. Landlords should confirm how access will be provided, while homeowners planning installations should share drawings and expected dates. We provide a free, no-obligation quote and discuss pricing before work begins, including agreed changes to pipework or controls.

Frequently asked questions
Can you replace a boiler in Washington?
Yes. We assess the property's heating layout, hot-water demand, controls and accessible pipework before discussing a suitable boiler and providing a quote for the agreed installation scope.
What do landlords need for a gas safety visit?
Provide the property address, known gas appliances and agreed tenant or agent access. This allows us to arrange the annual check and inspect the relevant appliances during the visit.
When should kitchen plumbing be planned?
Contact us after the layout and appliance positions are known but before services are hidden. We can then assess feed and waste alterations and coordinate final connections with the fit-out.
